Raising the temperature to 0 °C gives a bonus ocean tile placement. You get this bonus when you raise the parameter to that point, so the player who raises the temperature to 0 °C receives the ocean tile placement. The bonus is tied to reaching that point on the track.
The Power Plant standard project costs 11 M€ and increases your energy production 1 step. The Aquifer standard project costs 18 M€ and places an ocean tile. Together they cost 29 M€. Each standard project may be used several times during the same generation.
A card effect that reduces production of a red-bordered resource must be performed. If your opponent does not have that production, you must lower your own production or not play the card at all. Removing red-bordered resources instead of production is optional, and the card can still be played.
You may take 1 or 2 actions per turn, in any combination, including 2 of the same action. The exception is that each blue card action may be used only once per generation. If you pass, you are out of the round and may take no more actions this generation.