Can you build on a Building Site connected only to a Construction Road in Grinivil?

Building, and even completing, a Building on a Site connected to a Construction Road is allowed. This does not apply to Sites connected only to an Incomplete Half-road: building there is not allowed. A constructed Building can be used only when it is connected to a Completed Road.

Checked against Grinivil — Rulebook (EN) on October 28, 2026

What the rulebook says

  1. Building (and even completing) a Building on a Site connected to a Construction Road is allowed.

    • “connected to the Construction Road is possible.” — Grinivil — Rulebook (EN), p. 9
    • “you can even build (and complete) the Buildings on Sites connected to Construction Roads” — Grinivil — Rulebook (EN), p. 13
  2. This does not apply to Sites connected only to an Incomplete Half-road: building there is not allowed.

    • “does it allow building on a Building Site connected” — Grinivil — Rulebook (EN), p. 9
    • “(not to Incomplete Half-roads, though)” — Grinivil — Rulebook (EN), p. 13
  3. A constructed Building can be 'used' only when it is connected to a Completed Road; fully built Buildings are not usable or sellable until the road is completed.

    • “you can ‘use’ constructed Buildings only when they are connected to Completed Roads” — Grinivil — Rulebook (EN), p. 13
    • “Fully built Buildings are not usable or sellable until” — Grinivil — Rulebook (EN), p. 9
  4. Using a Building means it is taken into account when checking Residents' requirements and when awarding bonuses for fully constructed Buildings.

    • “into account when checking the fulfillment of the Residents’ Requirements” — Grinivil — Rulebook (EN), p. 13
Ask a follow-upAsk a follow-up about Grinivil
All rules questions about Grinivil